• <sup id="i0k8o"></sup>
  • <sup id="i0k8o"></sup>
  • Project Introduction:

    A certain brand builds a new factory with an annual output of 12 million high-performance semi-steel radial tires. In a factory of more than 100,000 square meters, it can realize the automatic handling and storage management of dozens of materials. Each material has different equipment and storage methods include flat warehouse and two Layer shelves, 9-meter high shelves, etc. The project uses 43 MAXAGVs to realize the automated distribution of materials in the workshop throughout the factory. Through the MAX scheduling management system, JIT (Just In Time) operations are realized, combined with MES to realize digital production scheduling. In the tire industry, this project is the world's first exemplary case to realize Industry 4.0.

      

    Return to list
    在線客服
    国产精品伦一区二区三级视频,成年福利福利片免费看,精品国产污污免费网站入口在线看,国产人成高清在线视频99